BWR
Japan's first light water reactor| Electric output | 357,000 kW |
|---|---|
| Reactor type | Boiling water reactor (BWR) |
| Fuel | Low enriched uranium (approx. 52 tons) |
| Start of commercial operation | March 14, 1970 |
| Power supplied to |
|
| Accumulated power generated | 82.60 billion kWh |
| Average capacity factor | 65.9% |
| Average availability factor | 68.6% |
Mechanism of a Boiling Water Reactor (BWR)
Supplying Electricity to Electric Power Companies
JAPC's power stations in Tokai-mura (Ibaraki) and Tsuruga-city (Fukui) are operated to provide a stable and high-quality power supply every day, in accordance with our "Safety First" policy. Electricity produced at these stations is delivered to the customer through local electric power companies.